WP_Post Object ( [ID] => 4913 [post_author] => 1 [post_date] => 2017-03-06 13:02:39 [post_date_gmt] => 2017-03-06 21:02:39 [post_content] => Hi John, The designer of the project has not yet been decided. As of March 2017, KBR Inc. and JGC America Inc. are conducting Front End Engineering and Design (FEED) in parallel for the Woodfibre LNG Project. At the end of the parallel FEED process, these two groups will submit Engineering, Procurement and Construction (EPC) proposals and we'll award one of the companies an EPC contract. [post_title] => Hi - could you tell me who is the designer of this project? [post_excerpt] => [post_status] => publish [comment_status] => open [ping_status] => open [post_password] => [post_name] => hi-could-you-tell-me-who-is-the-designer-of-this-project [to_ping] => [pinged] => [post_modified] => 2017-03-06 13:02:39 [post_modified_gmt] => 2017-03-06 21:02:39 [post_content_filtered] => [post_parent] => 0 [guid] => https://www.askwoodfibrelng.ca/?p=4913 [menu_order] => 0 [post_type] => post [post_mime_type] => [comment_count] => 0 [filter] => raw ) Array ( [0] => WP_Term Object ( [term_id] => 1 [name] => Uncategorised [slug] => uncategorized [term_group] => 0 [term_taxonomy_id] => 1 [taxonomy] => category [description] => [parent] => 0 [count] => 186 [filter] => raw [cat_ID] => 1 [category_count] => 186 [category_description] => [cat_name] => Uncategorised [category_nicename] => uncategorized [category_parent] => 0 ) )

Hi – could you tell me who is the designer of this project?

- J. Kross, British Columbia

Hi John,

The designer of the project has not yet been decided. As of March 2017, KBR Inc. and JGC America Inc. are conducting Front End Engineering and Design (FEED) in parallel for the Woodfibre LNG Project.

At the end of the parallel FEED process, these two groups will submit Engineering, Procurement and Construction (EPC) proposals and we’ll award one of the companies an EPC contract.